Free Tool Construction
Construction RFP Readiness Checklist
Owners, developers and their representatives can look at your website before they put you on a bid list. Answer 13 questions and see how well yours answers their prequalification questions, with a score out of 100 and a fix guide for every gap.
How to fill it in
Answer for your website as it is today, not for what you send when someone asks. A capability statement that lives only on the estimator’s laptop is a No. Each question takes Yes, No or Not sure. Nothing is filled in for you, and your score appears once every question has an answer.
“Not sure” counts as half and goes on the “check these” list in your fix guide. Two questions also offer “Doesn’t apply”: diversity certifications if you hold none, and LEED if you don’t mention it. Those are left out of the score.
Some answers depend on documents you may need to pull: your experience modification worksheet from your insurance agent, your OSHA 300 logs, a letter from your surety and your certification paperwork.
What the result tells you
Each question carries a weight from 1 to 3. A capability statement, a published EMR and project pages by sector carry the most. Yes earns the full weight, Not sure half and No nothing, and the total is scaled to 100. A score of 85 or more reads as strong, 60 to 84 as a solid base with gaps, and under 60 as real gaps. The four sections, capability, safety, bonding and certification, and projects and team, each get their own score.
The free result says how many items to fix and how many to check. Enter your email for the fix guide: every No, heaviest first, with what to add, then every Not sure to confirm. It downloads as a PDF too.
The checklist tells you whether your site answers the questions, not whether your answers will win. It can’t say whether your EMR or bonding capacity meets a given owner’s limits.
The numbers and forms owners ask about
EMR. NCCI explains that experience rating compares an employer’s experience with the average employer in the same classification, usually using the latest available three years of data. A mod of 1.00 is unity, below 1.00 is a credit and above 1.00 is a debit. NCCI says its plan doesn’t apply in some states, including California, New York and Pennsylvania, so ask your agent who produces your mod.
Incident rate. OSHA’s formula is the number of injuries and illnesses times 200,000, divided by employee hours worked. The 200,000 is the hours 100 employees would work at 40 hours a week for 50 weeks, which is what makes rates comparable across firms of different sizes.
Qualification statements. AIA describes A305-2020 as a contractor’s qualification statement owners use to verify background, references and financial stability. It is a one-page form used with at least one of five exhibits, from general information to past project experience. ConsensusDocs 221 is the Contractor’s Statement of Qualifications.
Certifications. SBA’s certification programs are 8(a), women-owned small business (WOSB and EDWOSB), HUBZone and veteran-owned. MBE, WBE and DBE certifications aren’t on SBA’s list, so name the body that certified you. For LEED, the USGBC rates buildings Certified, Silver, Gold or Platinum by points earned, while LEED Green Associate and LEED AP are credentials held by people. Keep the two apart on your site.
Where SEO fits
In our analysis of 965 contractor websites, 70% had a project portfolio or gallery, but portfolios showed no measurable ranking edge on their own. A page per project, with its own title, location, scope and photos, gives search engines something to read. Our guides to on-page SEO for builders and remodelers and the SEO mistakes we found in 965 construction websites cover how to build them.
Want help turning your capability statement and projects into pages? Talk to us about construction SEO.
Questions, answered
What EMR do I need to get on a bid list?
Each owner sets its own limit, if it has one. NCCI treats 1.00 as unity, with lower numbers a credit. We don’t publish a cutoff, because we haven’t found one we can verify. Publish your current mod with its policy year and update it every year.
Should I publish my bonding capacity?
The checklist gives full credit for either stating your single and aggregate capacity or naming your surety and offering a letter on request. Which you choose is a business decision.
What’s the difference between AIA A305 and ConsensusDocs 221?
Both are standard contractor qualification statements. A305-2020 is a one-page form with exhibits for general, financial, project-specific and past project information. ConsensusDocs 221 is that publisher’s contractor form. Owners usually tell you which they want, so keep both current if you see both.
Is a PDF capability statement enough?
Keep the PDF, because owners and agencies ask for it. Put the same information on a web page too, so someone checking your site finds it without downloading anything.
Sources
- NCCI, ABCs of Experience Rating
- OSHA standard interpretation, 2016-08-23 (incidence rate formula)
- AIA Contract Documents, A305-2020 Contractor’s Qualification Statement
- ConsensusDocs, comparison chart (221)
- SBA, Certifications
- USGBC, LEED rating system
- The Fractional SEO Construction Study, October 2026: the SEO mistakes most contractors make